Field Services
Mobile, High-Vacuum Purification
Power Transformer Service
Switchgear & Circuit Breaker Service
Generator
Protection & Control Equipment Service
Commissioning of New Installations
Engineering Services
|
Generator
Electrical Testing
1. Stator
- Insulation Resistance & PI
- Power Factor of Insulation (Doble) & PF Tip-Up
- Capacitance & Dissipation Factor
- Winding Resistance
- Corona Probe (Partial Discharge) Examination
- El-Cid core integrity/loss test, interpretations and recommendations
- Electrical core loss testing Polarization index testing
2. Rotor
- Insulation Resistance
- Winding Resistance
- AC Impedance
Mechanical Inspections
- Rotor wedge check
- Stator wedge check
- Coil extension and bracing inspection
- Slot exit inspection
|
| |